Jointline have been busy at the UKs biggest airport once again. This time we have been installing pathfinding / safe walking routes and hazard markings through one of the main baggage areas in Terminal 2. Our crews had to work in a relativley tight space around the steel cages situated either side of the proposed walkway.
All areas were adequately prepared, primed and given 2 coats of specialist antislip material to ensure grip underfoot. The works were then finished by installing edgelines and pedestrian logos in a contrasting colour.
Our crew were pleased with the finished result and most importantly the client was too.
Great work lads.