The Mill Adventure Base
- Resin Bound
- Public Sector
Highways Line Marking for Charterholme Residential Development
Jointline recently delivered highways line marking works at Charterholme, a significant new residential development site in Lincoln. Appointed by Graham Civil Engineering as part of the Section 278 (S278) Works, the project involved the completion of white lining along a newly constructed access road connecting to Tritton Road. This early phase of infrastructure plays a critical role in enabling phased access to the wider site, which is earmarked for housing, education, retail, and community facilities.
The completed access road marks a key milestone for the Charterholme scheme and supports the local authority’s long-term plans for urban expansion. Jointline’s contribution ensures that the route operates safely and in compliance with national highways standards from the outset, forming the groundwork for continued development across the site.
As part of the S278 agreement, the client required the construction and commissioning of a new access road to facilitate the safe entry and exit of vehicles from Tritton Road, a heavily trafficked arterial route in Lincoln. The challenge for Jointline was to complete the road marking works to a high standard of accuracy while adhering to tight scheduling and coordination with other construction activities onsite.
The road forms part of a larger infrastructure spine that will eventually connect to Skellingthorpe Road, creating a continuous transport corridor through the development. Therefore, all markings needed to align precisely with long-term traffic planning and future junction layouts. In addition, the works had to be completed with minimal disruption to the existing highway and surrounding residential areas.
Jointline’s highways delivery team mobilised promptly to site, working closely with Graham Civil Engineering to ensure efficient phasing of the road marking works. The team applied thermoplastic white lines using industry-standard equipment and materials, ensuring maximum visibility, durability, and compliance with local authority specifications.
Particular attention was paid to the geometry and positioning of the markings to support both current traffic movements and the anticipated evolution of the road layout as further phases of the development come online. This included the accurate placement of centre lines, edge markings, and stop lines to facilitate safe vehicle movement through the new junctions and access points.
Clear lines of communication between all contractors ensured that works were completed within the agreed programme, avoiding any delays to the opening of the road. All activities were delivered in line with health and safety protocols and traffic management plans.
The completion of the line marking works has brought the new access road into safe and effective use, enabling vehicular access from Tritton Road to the Charterholme development for the first time. This improved connectivity supports ongoing construction activity across the site while also providing a safe route for site traffic, emergency services, and future residents.
From a long-term perspective, the access road forms a crucial part of the site-wide transport strategy. It will ultimately connect to a new junction at Skellingthorpe Road, facilitating through-access across the development. The clear, compliant, and high-visibility markings laid by Jointline will play an important role in maintaining road safety and traffic efficiency as site usage increases.
By delivering precise and durable line markings in line with the S278 agreement, Jointline has supported a critical infrastructure package that underpins Lincoln’s growth, contributing to the city’s vision for sustainable housing, integrated public services, and enhanced local mobility.