Over a weekend, Jointline's Highways crews undertook an ambitious project on the M62 Junction 24 slip road for National Highways. Recognising the need for more than just a superficial update, the decision was made to not merely reline but to completely overhaul the road markings to meet modern standards of safety and visibility.
The Challenge
The existing road markings on the M62 Junction 24 slip road were significantly worn and no longer met the required standards for clarity and safety. The challenge was not only to refresh these markings but to enhance the road's overall safety features and visual quality within a limited timeframe, ensuring minimal disruption to traffic.
The Solution
The approach was comprehensive:
Complete Removal and Relining: The old markings were fully removed, and new lines were applied, ensuring a straighter, cleaner finish.
Scabbling Work: This preparation work created a smoother surface for the new markings, ensuring better adhesion and longevity.
Marking Upgrades: The standard markings were replaced with high-visibility 200 Millicandela screed, improving visibility under various weather conditions.
Safety Improvements: Old castings were removed, and new Halifax depressible units were installed. Additionally, cat's eyes and other road features were upgraded to enhance overall road safety.
The Results
The project transformed a routine maintenance task into a significant upgrade for the M62 Junction 24 slip road. The new road markings, featuring high-visibility screed and advanced safety features, significantly enhanced both the aesthetic and functional aspects of the road. These improvements have not only increased the safety for daily commuters but also extended the longevity of the road's surface markings, reducing the need for frequent maintenance. Feedback from National Highways and road users has been overwhelmingly positive, commending the quality of work and the efficiency with which it was executed.