New woodland pathways and resurfaced accessible trail routes constructed at Sherwood Pines for Forestry England visitor access improvements.

Introduction

Jointline prepared a specialist civil engineering package for Forestry England’s Sherwood AFA Trail Work project at Sherwood Pines. The scheme focused on improving accessibility, surfacing quality, and visitor experience across multiple woodland trail routes and public access areas within the popular forest destination.

The proposed works included the construction of new accessible pathways, resurfacing of existing routes, regrading works, and improvements to disabled parking facilities, helping Forestry England enhance inclusive access throughout the site.

The Challenge

The Sherwood AFA Trail Work project required upgrades across several active public-use areas within a woodland environment. The works needed to improve accessibility and usability while maintaining the natural character of the forest setting.

Challenges included:

As Sherwood Pines is a busy visitor destination, careful planning was also required to safely manage public interaction throughout the works. Construction activities had to be coordinated around peak visitor periods, with deliveries carefully timed to minimise disruption. Certain working areas were temporarily cordoned off, with additional signage installed to maintain safe pedestrian movement and clear communication across the site. Jointline also worked closely with Forestry England visitor centre staff to identify suitable timing windows for activities affecting high-traffic areas such as car parks and main access routes.

The scheme also required careful material selection and installation techniques to ensure long-term durability while blending with the surrounding landscape.

The Solution

Jointline developed a detailed pathway and access improvement solution covering several key locations throughout the Sherwood Pines site.

The proposed works included:

To minimise disruption to visitors, Jointline implemented phased working areas, temporary barriers, and additional wayfinding signage throughout the programme. Deliveries and higher-impact activities were scheduled around quieter operating periods wherever possible, helping maintain safe public access while ensuring efficient project delivery.

The works were designed to provide safe, durable, and accessible routes while maintaining the woodland character and minimising environmental impact throughout construction activities.

The Benefits

The Sherwood Pines trail improvement scheme was designed to significantly enhance accessibility, safety, and visitor experience across key public areas of the forest site.

The completed improvements would:

By combining specialist civils expertise with sensitive woodland construction methods and proactive public management, Jointline demonstrated its capability to deliver high-quality public realm and accessibility improvements within active recreational forestry environments.